Royal Mail Warrington
This project comprised of the transformation of a warehouse into a Royal Mail Distribution Centre.
Charles Andrews was appointed to design of the M&E services within the buildings and for the fit out of the kitchen and dining areas.
The site services have included:
-HV and LV electrical supply upgrade
-Site internal and external lighting |
|
 |
 |
Manchester Airport - Airtours Extension
Construction of a new Baggage Handling system from Airtours International check - in facility. Charles Andrews’ role was to provide design construction MGT support to the main contractors Teleflex - Gallet included the following: |
-Heating and Ventilation
-Air Conditioning
-Hot/Cold Water Services
-Lighting & Emergency Lighting
-Fire Alarm System / Fire Safety
|
-Relocation & Diversion of M&E services
-Building Regulations & Planning Application
-Drainage Steelwork
-Minor Civil Works |
|
 |
 |
Exchange Quays
This project covers the M&E design and consultancy advice on
Maintenance and refurbishment on an ongoing basis.
Services Provided include the following: |
-Fit out works design brief
-Tender documentation and review for M&E maintenance
-External services ‘As fitted drawings’
-Contract document
-Strategic Consultancy
|
|
|
 |
 |
O'Connor Gatehouse
Services Provided include the following: |
-Heating and Ventilation
-Comfort Cooling
-Hot/Cold Water Services
-Lighting & Emergency Lighting
|
|
|
 |
 |
Places for People Offices and Data Centre
This project comprised a new office building for Places for People. The shell building was constructed to Cat A fit out standard and the Cat B fit out was completed under direct management of the client through their Project Manager JJ& B Projects.
CA undertook the role of monitoring the Cat A fit out and at the same time were responsible for the design and monitoring of the Cat B fit out and the main company Data Centre which had an electrical capacity requirement in excess of 1.5MVA.
|
 |
 |
St. Pauls Place
This project comprised the M&E design of a new office development in Sheffield.
Services Provided include the following: |
-Heating and Ventilation
-Air Conditioning
-Hot/Cold Water Services
-Lighting & Emergency Lighting
-Fire Alarm System / Fire Safety
|
-Security & CCTV
-Standby Generation System
-Smoke Ventilation Systems
-Lifts |
|
 |
 |
Market Street
This project comprised the M&E design of new council offices in Nelson. Charles Andrews Ltd were appointed to design the M&E services, IT fit out and to monitor the installation in accordance with Building Regulation
Services Provided include the following: |
-Heating and Ventilation
-Air Conditioning
-Hot/Cold Water Services
-Lighting & Emergency Lighting
|
-Security & CCTV
-Fire Alarm System / Fire Safety
-Smoke Ventilation Systems
|
|
 |
 |
Progressive House
This project comprised the M&E design of a new office development in Runcorn.
Services Provided include the following: |
-Heating and Ventilation
-Air Conditioning
-Hot/Cold Water Services
-Lighting & Emergency Lighting
-Fire Alarm System / Fire Safety
|
-Security & CCTV
-Standby Generation System
-Smoke Ventilation Systems
-Lifts |
|
 |
 |
O'Connor Gatehouse
Services Provided include the following: |
-Heating and Ventilation
-Comfort Cooling
-Hot/Cold Water Services
-Lighting & Emergency Lighting
|
|
|
 |
 |
Aalborg Place
This project comprises the construction of a new mixed use development comprising residential apartments, retail and offices.
The scheme is located in the heart of Lancaster on the banks of the Lancaster Canal.
Charles Andrews were responsible for the design of the M&E services within the building. |
|
 |
 |
Platts Lodge
This project comprises the construction of a new mixed use development comprising residential apartments, hotel, retail and office accommodation in Accrington.
Services Provided include the following: |
-Heating and Ventilation
-Hot/Cold Water Services
-Lighting & Emergency Lighting
-Fire Alarm System / Fire Safety
|
-Security & CCTV
-Standby Generation System
-Lifts
-Building Acoustics |
|
 |
 |
Northumberland Road
This project comprises the construction of a new mixed use development comprising residential apartments, retail and office accommodation. in Manchester.
Services Provided include the following: |
-Heating and Ventilation
-Hot/Cold Water Services
-Lighting & Emergency Lighting
-Fire Alarm System / Fire Safety
|
-Security & CCTV
-Standby Generation System
-Lifts
-Building Acoustics |
|
 |
 |
Blackfriars Road
This project comprises the construction of a new mixed use development comprising residential apartments, retail and office accommodation. in Manchester.
Services Provided include the following: |
-Heating and Ventilation
-Hot/Cold Water Services
-Lighting & Emergency Lighting
-Fire Alarm System / Fire Safety
|
-Security & CCTV
-Standby Generation System
-Lifts
|
|
 |
 |
River Street
This project comprises the construction of a new mixed use development comprising residential apartments, retail and office accommodation. in Manchester.
Services Provided include the following: |
-Heating and Ventilation
-Hot/Cold Water Services
-Lighting & Emergency Lighting
-Fire Alarm System / Fire Safety
|
-Security & CCTV
-Standby Generation System
-Lifts
-Building Acoustics |
|
 |
 |
Watery Road
This project comprises the construction of a new mixed use development comprising residential apartments, retail and office accommodation. in Manchester.
Services Provided include the following: |
-Heating and Ventilation
-Hot/Cold Water Services
-Lighting & Emergency Lighting
-Fire Alarm System / Fire Safety
|
-Security & CCTV
-Standby Generation System
-Lifts
-Building Acoustics |
|
 |
 |
Shell Stanlow New Control Facility (CCR Building)
This project comprised the construction of a new Central Control Room CCR to replace a number of nodal control rooms in hazardous locations throughout the site. The blast resistant building was located in a semi safe area of the site.
In addition to our duties of undertaking the design of the M&E services within the building we also liaised with the site team for the alterations and diversions of site HV and LV electrical systems, steam, water, C&I systems, mains water, site hydrant systems. . |
|
 |
 |
Fox's Biscuits
This project comprised the M&E design and project management to the
Ventilation and cooling systems to reduce product wastage at Fox’s Biscuits in Kirkham.
Services Provided include the following:
-Design of Ductwork for cooling equipment
-Ventilation system to conveyor belt
-Ventilation system to Sogem Bend and Pre Sapal
-Modifications to control system |
|
 |
 |
AstraZeneca Laboratory Block
Services Provided include the following: |
-Refurbishment of Ventilation and Air Conditioning Systems
-Control Systems
-Air Conditioning, Heating and Ventilation
-Mechanical Controls System
-Hot/Cold Water Services
|
|
|
 |
 |
Park Cake Bakeries - Bakery Oven Installation
This project consists of the removal of an existing oven in a large bakery. Dismantling and relocation of another oven to its new location with testing, commissioning and bakery trials.
Works were let on a planning supervision and project management basis. The services Provided include the following: |
-Compressed air lines
-Conveyor control systems
-Hygienic wall and ceiling installations
|
-Floor tiling works
-Asbestos removal
-M&E Services |
|
 |
 |
Gas Booster/Treatment Stations Upgrade
This project consists of the conceptual design fro Gas Booster/Treatment Stations. Charles Andrews were contracted to act as Dresser-Rand’s consultant, advising them regarding the upgrade requirements and re-introduction of these flow stations, by producing conceptual design philosophy documents from which the detailed design and construction will be based. Charles Andrews produced conceptual design philosophy documents for the following packages: |
-Vent and emergency shutdown systems
-Storm Water drainage systems
-Open Water drainage systems
|
-AOC Water drainage systems
-Process Water drainage systems |
|
 |
 |
West Bromwich Albion FC New Corporate Stand
This project comprised the development of a new corporate stand at The Hawthornes and was completed in early 2000’s. Charles Andrews was involved throughout the whole design and construction period and provided full M&E Consultancy duties throughout the project.
The Contract was let on a design and build basis with Charles Andrews undertaking regular site inspections throughout the project. |
|
 |
 |
Chesterfield Football Club
This project comprises the development of a new 10,000 capacity stadium developed to replace the old Saltergate stadium which has been the home of the club for many years. The new stadium is located on the old Dema Glass site and is part of the local development plan for the region. The site wide development undertaken by Wilson Bowden Developments includes a new Tesco store, space for an office / leisure / retail development and the stadium. The stadium development has been undertaken by our client GB Development Solutions who introduced GB Building Solutions to carry out the construction. The procurement route was a JCT Design and Build Contract and CAL was novated to the Contractor to complete the design development process post tender. |
|
 |
 |
Shay Stadium Halifax
This project comprises the completion of the partly constructed East Stand to enhance the facility and make it sustainable for ongoing use by the Halifax Town FC and Halifax RLFC.
The East Stand construction commenced in the early 1990’s and the structural steel frame was constructed. Due to various commercial problems the building was not completed and was left partly used and exposed the elements until Calderdale Council took control of the stadium in 2007 and put in place a plan to complete the stand. .
One of the major challenges of this project was the need to utilise as much as possible of the existing steel frame.
|
|
 |
 |
Charlton Athletic FC New Corporate Stand
This project comprised the construction of the new North stand comprising Concourse areas, Executive Lounges, Business club, Leisure Club Facilities and Terraces areas and the North West and North East corner infill terrace areas. CAL provided full M&E Consultancy services throughout.
|
|
 |
 |
New Bar Area MEN Arena
This project involved the design of the mechanical services for the proposed conversion from office space to a new Champagne Bar, Kitchen and Boardroom.
Charles Andrews were commissioned to design the ventilation and associated systems i.e. LPHW heating and chilled water to serve the coils together with controls modifications. In addition, hot and cold water with the above ground drainage to the kitchen and bar area.
|
|
 |
 |
|
| |
|
|