header image
Project

Shell Stanlow Shutdown Village - Cheshire

Industrial
Sector

Industrial

Location
Location

Cheshire

Timeline
Timeline

16 months

Value
Value

£10 Million

Client
Client

Shell/R J Lewis

This project comprises the development of a shutdown facility within the critical area of the plant. The facility requires blast resistant features to prevent injury to operatives during shutdown operations. 

The M&E services design was carried out based on modular pre-fabricated construction principles to ensure speed of installation and flexibility of operation. 

Services provided include the following: 

  • Critical Control Systems 
  • General Lighting & Power 
  • Air Conditioning, Heating and Ventilation  
  • CCTV System (Internal & External)  
  • Public Address System    
  • Hot/Cold Water Services 
  • Mechanical Controls System 
  • External Lighting 
  • Emergency Generator 
  • Fire Alarms 
  • Emergency Lighting 
  • Lighting Protection System 

Related Projects.